In addition to our portfolio of large distribution centers and manufacturing, ATI has been a leader in providing design services for smaller industrial projects targeting small start-up or expanding businesses. The Speedway Industrial Park in Irwindale, CA is representative of such projects.
The site features the repositioning of a parcel that was part of the major gravel pit mining operations in Irwindale that served the construction industry throughout Southern California. It is similar to many of the properties currently being developed in the area, and is an odd-shaped site. Our solution was to design four small concrete tilt-up/hybrid panelized roof structures in the 17,000 sf to 28,000 sf range.
Buildings feature 28’ clear heights, large bay spacing, and secure, interior truck loading wells. Exterior design elements are a Mission style per the City’s design guidelines. Buildings are set up for Warehousing and Manufacturing uses. The project was completed in 2006.
Seventh Street Development of Long Beach, CA was the Developer. Millie and Severson of Los Alamitos, CA was the General Contractor.