Click for Single Story Emily Brochure ------------------------------------------------------------- Click for 2 Story Flyer More Projects: 1a | 1b | 1c | 2a | 2b | 2c | 3 | 4 | 5 Project Info>
Conley – Caraballo High School made headlines for its fast construction schedule. The design phase began in January – groundbreaking occurred in March – the school opened August 31. The new campus houses 500 students. This fast track project was designed, state approved and constructed in 9 months utilizing ATI’s Emily revolutionary classroom design. This project is listed by the Collaborative for High Performing Schools (CHPS) and is a featured high performance school and includes a Photovoltaic system that provides 85% of the schools energy needs. At its completion, Conley - Caraballo became a magnet continuation school achieving an 83% graduation rate with a waiting list for entry.
|
|||